<source id="mfh6s"></source>

<mark id="mfh6s"></mark>

    <u id="mfh6s"></u>
  • <rp id="mfh6s"><noframes id="mfh6s"><tt id="mfh6s"></tt></noframes></rp>
      <source id="mfh6s"><legend id="mfh6s"></legend></source>
    <rp id="mfh6s"><menu id="mfh6s"><noframes id="mfh6s"></noframes></menu></rp>

    1. <mark id="mfh6s"><div id="mfh6s"><u id="mfh6s"></u></div></mark>
    2. <acronym id="mfh6s"><pre id="mfh6s"></pre></acronym>
    3. Overseas power industry investment operators
      Nepal Sajen Khola Hydropower Project
      source: Author: Date: 2018-09-20 Font size: [large medium small]

        

        

        

        

      The Sajen Khola Hydropower Project in Nepal is invested by China Harbour to build a hydropower station with an installed capacity of 78MW and an annual generating capacity of 422GWh on the Sajen Khola River in Nepal. The project adopts BOOT mode, the construction period is 4 years, and the operation period is 30 years. Nepal is a hotspot area of the Belt and Road. After the project is completed, it will greatly solve the problem of long-term power shortage in Nepal and improve the living standards of the Nepalese people.

      色AV永久无码AV影院,五月天丁香婷深爱综合网站,狠狠色丁香婷婷综合久久图片,伊人久久综合成人网